Improving Dawn Fraser Baths


Developing a 10-year shared vision for the ongoing conservation of the historic and much-loved Dawn Fraser Baths precinct.


Background

During October and November 2017 Inner West Council completed community engagement on the current use and future vision for the Dawn Fraser Baths. The feedback we received has been used to develop the draft Dawn Fraser Baths Master Plan which will be used to guide improvements at the Baths over the next ten years.


What is proposed to improve the Dawn Fraser Baths?

The draft master plan proposes strategies that aim to improve the user experience at the Baths and in

Developing a 10-year shared vision for the ongoing conservation of the historic and much-loved Dawn Fraser Baths precinct.


Background

During October and November 2017 Inner West Council completed community engagement on the current use and future vision for the Dawn Fraser Baths. The feedback we received has been used to develop the draft Dawn Fraser Baths Master Plan which will be used to guide improvements at the Baths over the next ten years.


What is proposed to improve the Dawn Fraser Baths?

The draft master plan proposes strategies that aim to improve the user experience at the Baths and in Elkington Park, while maintaining the existing character and sense of place. Some of the master plan strategies include:

  • Renovate the male and female showers, toilets and change rooms
  • Provide family change rooms
  • Provide equal access toilet, shower and change room
  • Provide additional seating options with moveable tables, chairs and sun lounges around the pool deck
  • Install pool-side shade umbrellas
  • Upgrade the existing lighting at the Baths to meet water polo match play requirements
  • Install a curated memorabilia display area
  • Improve the entry configuration and access from the harbour foreshore
  • Renovate the foreshore car park to improve equal access car parking and drop off area and provide an accessible route from the car park to the Baths entry
  • Improve the vehicle access driveway from Fitzroy Avenue
  • Raise the Baths floor level to mitigate climate change and sea level rise
  • Raise the beach area so entry is flush with the pool deck and install children’s seating terraces at the beach edges
  • Undertake weed removal and bank stabilisation with new locally native tree, shrub and groundcover plantings on the escarpment immediately behind the Baths
  • Improve the playground within Elkington Park and include nature play and planting
  • Renovate the public toilet facility within Elkington Park
  • Include Water Sensitive Urban Design (WSUD) options to improve quality of stormwater entering the harbour


Have your say

We’d like to hear from you again before Council adopts the Master Plan. Your contributions will help to ensure the proposed Dawn Fraser Baths improvement meet your needs now and into the future. Complete the form below to tell us whether you support the draft plans and provide any comments.


Further Information

Read the Council Report


What happens next?

The feedback received will be incorporated into the final master plan which will be considered by Council for adoption. All those who provided feedback will be advised when the master plan will be considered by Council.

Queries?

Please contact Arturo Ruiz, Master Planning Officer

P: +61 2 9392 535509 | E: Arturo.Ruiz@innerwest.nsw.gov.au

Or

Please contact Vanessa Phillips, Public Domain Planning Officer

P: +61 2 9335 2267| E: Vanessa.Phillips@innerwest.nsw.gov.au





  • Council adopts Dawn Fraser Baths master plan

    9 months ago

    Council considered an engagement report about the master plan at a meeting on 6 November 2018 and it adopted the master plan which will inform future capital upgrades of the Baths.

    Read the business report from this meeting and view the master plan.

    Council considered an engagement report about the master plan at a meeting on 6 November 2018 and it adopted the master plan which will inform future capital upgrades of the Baths.

    Read the business report from this meeting and view the master plan.

  • Read the community engagement report

    over 1 year ago

    The feedback gathered during the recent engagement has been gathered into a report. Read the Engagement Outcomes report pdf.

    The feedback gathered during the recent engagement has been gathered into a report. Read the Engagement Outcomes report pdf.

  • Pop-up cancelled due to wet weather - Sunday 5 November

    almost 2 years ago

    Apologies to anyone who came to speak to Council staff on Sunday 5 November. The Dawn Fraser Baths were closed and ongoing rain showers made it unsuitable for holding the event.

    There will be another opportunity to speak to staff at a pop-up in Dawn Fraser Baths on Saturday 11 November.


    Apologies to anyone who came to speak to Council staff on Sunday 5 November. The Dawn Fraser Baths were closed and ongoing rain showers made it unsuitable for holding the event.

    There will be another opportunity to speak to staff at a pop-up in Dawn Fraser Baths on Saturday 11 November.