Project stages

  • Timeline item 1 - complete

    Concept design: open for comment

    Provide feedback on the report and options.

  • Timeline item 2 - active

    Under Review

    We're reviewing your feedback.

  • Timeline item 3 - incomplete

    Report to Local Transport Forum

  • Timeline item 4 - incomplete

    To Council for decision

  • Timeline item 5 - incomplete

    Construction Phase

Resident Letter

What happens next?

All feedback will be reviewed and included in a report to the Local Transport Forum in late 2026. Everyone who provided feedback will be notified by email when the report will be discussed at the the Forum.


Project details


The proposed route will provide a safer and more connected bike route between Parramatta Road, Leichhardt and Marrickville Park.

The project includes safer crossings and intersection upgrades, new signs and pavement markings, accessibility improvements, and traffic calming measures to support safer travel for people walking and riding.

We have developed a concept design for the Parramatta Road, Leichhardt to Marrickville Park Bike Route and invite the community to provide feedback.

Inner West Council is proposing a new bike route between Parramatta Road at Petersham and Marrickville Park.

The route was identified in the former Marrickville Bicycle Strategy and would provide an important north-south connection through the Inner West. It would link with existing cycling routes, including connections towards the Hawthorne Canal and Cooks River cycleways.

The project aims to create a safer and more accessible route for people riding bikes by improving crossings, intersections and wayfinding along the route. These improvements will help make cycling a more practical and attractive option for local trips.


In person pop-up sessions



View the Bike Route concept design


We're proposing improvements to create a continuous bike route between Parramatta Road, Leichhardt and Marrickville Park.

The route will include better signs and road markings, safer road crossings, upgraded kerb ramps, traffic calming measures, landscaping and intersection improvements.

These changes will make it safer and easier to ride a bicycle, improve access for people walking and using mobility aids, and support more active and sustainable travel across the Inner West.

The proposed works include

Reconstruction of kerb ramps to improve accessibility for cyclists and pedestrians and ensure compliance with Transport for NSW standards. Modification of traffic signals to incorporate bicycle crossings, together with upgrades to shared path signage, logos and bicycle guide signage.

Intersection modifications involving the removal of the existing slip lane and reconstruction of a new larger landscaped island to close off the slip lane. The works also include the provision of 2 speed control devices in Thomas Street near West Street to slow traffic as they approach the intersection. Existing on-street parking signage and spaces will be rearranged to accommodate the proposed intersection and cycling improvements. This will result in the overall loss of 1 on-street unrestricted parking space.

Provide footpath pavement logos and signage to indicate pedestrian and bicycle shared path

Repaint and provide new on-road bicycle logos to indicate the existing on-road cycle path

Reconstruction of kerb ramps to improve accessibility for cyclists and pedestrians and ensure compliance with Transport for NSW standards. Modification of traffic signals to incorporate an on-road bicycle lane, incorporate bicycle crossings, together with upgrades to shared path signage, logos and bicycle guide signage

Repaint and provide new on-road bicycle logos to indicate the existing on-road cycle path.

Repaint and provide new on-road bicycle logos to indicate the existing on-road cycle path.

    • In Morgan Street (at existing road closure): remove the existing bollards and provide 2 new bollards placed centrally within the existing opening to allow cyclists to pass through more easily.
    • In Napier Street (at Morgan Street): construct 1 new landscaped kerb blister island (west side)

Construct a new pedestrian/cyclist refuge island together with a landscaped kerb blister island. Provide road and footpath logos and line markings together with this treatment. This will result in the loss of 1 on-street parking space.

Provide footpath pavement logos and signage to indicate pedestrian and bicycle shared path.

  • In Frazer Street: remove the existing pedestrian refuge island near Bishop Street and construct a new pedestrian refuge island near Miller Lane together with 3 new landscaped kerb blister islands. Existing on-street parking signage will be adjusted to accommodate the new works. This will result in the removal of 3 existing on-street parking spaces in the vicinity of the new works. Conversely, 4 new on-street parking spaces will be created between Lawson Avenue and Bishop Street (south side).
  • In Miller Lane: reconstruct the Miller Lane closure to accommodate new 2 way bicycle lanes. The existing tree within the road closure will be removed to provide the required space for the new 2 lane cycle path. adjustment of parking signage, and associated signage and line marking.
  • Installation of new bicycle guide signs throughout the corridor.
  • Installation of bicycle pavement logos and shared-path symbols.
  • Provision of supplementary directional signs and pavement arrows at key decision points and intersections.
  • Provision of coloured pavement treatments including green conflict-area surfacing and blue edge lines in selected locations.
  • Installation of bicycle symbols approximately every 50 m where indicated.
  • Construction of new kerb ramps at multiple intersections.
  • Removal, relocation and installation of regulatory signs.
  • New bike-route directional signage.
  • Updated parking restriction signage.
  • Removal of seven (7) existing on-street parking spaces at 3 locations (3 in Thomas Street; 3 in Frazer Street and 1 in Morgan Street) to accommodate the proposed bicycle infrastructure and traffic islands.
  • Providing 5 new / relocated parking spaces overall (2 in Thomas Street and 4 in Frazer Street).

Parking changes

It is proposed to adjust the existing “No Stopping” signs and zones at Thomas Street and West Street, Morgan Street and Livingstone Road, and Frazer Street and Miller Lane. These changes will result in the loss of seven (7) existing on-street parking spaces and the provision of six (6) new on-street parking spaces, resulting in a net loss of one (1) on-street parking space.


Click the two arrows in the top right corner to expand this image and view the concept design.


Download to your device


Have Your Say


You can also provide feedback by:

  • Completing the form below
  • Emailing to ashfaq.ahmad@innerwest.nsw.gov.au
  • Mailing to Inner West Council, Po Box 14, Petersham NSW 2049, c/o Ashfaq Ahmad
  • Calling us on 9392 5265

Other ways to provide feedback:

  • Call a FREE Interpreter or the National Relay Service, Monday to Friday between 9am-4pm and provide our phone number 02 9392 5265.
    • Free Interpreter call TIS National on 131 450
    • Voice relay call 1300 555 727
    • TTY call 133 677
    • SMS relay call 0423 677 767

Last day to provide feedback is 4 November 2026.

To complete the submissions form please create an account to join, or login to an existing account. The Your Say Inner West account is separate from other Council accounts.